compressive force造句
例句與造句
- Axial compressive force
軸向壓力 - This sensor is especially suited to the measurement of static and quasi - static compressive forces
這個(gè)型號(hào)的傳感器特別適合于測(cè)量靜態(tài)或準(zhǔn)靜態(tài)壓縮力。 - Experimental research on stability parameters for i - section aluminium alloy bars loaded by axial compressive force
工字形鋁合金軸心壓桿穩(wěn)定系數(shù)的試驗(yàn)研究 - Dies for presses for pressure connections ; mechanical presses with a nominal compressive force up to 15 and up to 60 kn connecting ; dimensions
壓力連接件用壓力機(jī)模具.標(biāo)稱壓力15kn和60kn以下的機(jī) - Dies for presses for pressure connections ; hydraulical presses with a nominal compressive force up to 300 , up to 450 and up to 1000 kn connecting ; dimensions
壓力連接件用壓力機(jī)模具.標(biāo)稱壓力為300 450和1000k - It's difficult to find compressive force in a sentence. 用compressive force造句挺難的
- Cancellous allografts can be obtained in a demineralized form that increases osteogenic potential but greatly decreases resistance to compressive forces
同種異體松質(zhì)骨進(jìn)行脫鈣處理后成骨性能得到加強(qiáng),但壓力抵抗會(huì)大大降低。 - Therefore the upper layer is water flow and the nether layer is debris flow . the moving water compressive force and the shear force of interface are taken into account
將粘性泥石流與主河的匯流視為分層流研究,上層為主河水流模型,下層為水下泥石流運(yùn)動(dòng)模型。 - It ideally meets the needs of these fields , being available in measuring ranges from 0 . 50 kg up to 0 . 5000 kg , suitable for both tensile and compressive force measurements
它非常符合這些領(lǐng)域的測(cè)量要求,可以測(cè)量0 . 50 kg最大0 . 5000 kg ,還適合于拉力和壓縮力的測(cè)量。 - At the same time , pulsating compressive force due to the crust movement including earthquake also made the crystallized rock ruptured and form ore control fault fracture and the host fracture
殘漿的形成與排出,控礦構(gòu)造的發(fā)生、發(fā)展與控礦過程,都是在這次地殼運(yùn)動(dòng)過程中完成的。 - Its test specimens are four hollow shear wall of reinforced concrete , which have the different the ratio of shear span to effective depth of section and the ratio of axial compressive force to axial compressive ultimate capacity of section
本課題為鋼筋混凝土空心剪力墻抗震試驗(yàn)研究及非線性有限元分析,課題的對(duì)象為四片不同軸壓比以及不同剪跨比的鋼筋混凝土空心剪力墻板。 - However , at present the heavy rammer method is still used to determine the standard of compactness and molding specimen by still compressive force in laboratory testing . which leads to the inconsistency of compaction mode between field compaction and laboratory compaction
但作為現(xiàn)場(chǎng)施工指導(dǎo)的室內(nèi)試驗(yàn),依然采用擊實(shí)法確定壓實(shí)度標(biāo)準(zhǔn),靜力壓實(shí)法成型試件,導(dǎo)致室內(nèi)試驗(yàn)的壓實(shí)方式和現(xiàn)場(chǎng)壓實(shí)狀況不一致。 - In static test , t - shaped and l - shaped specimens were respectively divided into four groups according to concrete strength grades , sectional height to thickness ratio , reinforcement ratio and ratio of axial compressive force to axial compressive ultimate capacity of section . how these factors affect the load - carrying and deformation of short - leg shear wall is known by analysis the result
在擬靜力試驗(yàn)中對(duì)t形和l形短肢剪力墻分別進(jìn)行了四組試驗(yàn),通過對(duì)試驗(yàn)結(jié)果的分析,揭示了混凝土等級(jí)、截面配筋率、軸壓比和墻肢截面高厚比等因素對(duì)短肢剪力墻承載力和變形的影響。 - The frequency of concrete strength testing is determined by the quantity of concrete used for a structure . a pre - cast mould is filled with concrete and , upon curing , soaked in water for 28 days before delivering to a laboratory for the " crushing " test . the compressive force needed to break the concrete represents the strength of the concrete
在建筑過程中,建造商要按地盤中使用石屎數(shù)量的多寡,去?定測(cè)試石屎強(qiáng)度的次數(shù),測(cè)試時(shí)建造商需要在預(yù)制的鑄模內(nèi)倒?jié)M石屎,待它凝固后浸在水里二十八日,再運(yùn)往實(shí)驗(yàn)室進(jìn)行測(cè)試,看看需要用幾大的力量才能把它壓碎,這個(gè)令石屎碎裂的力度就是石屎的強(qiáng)度。 - The frequency of concrete strength testing is determined by the quantity of concrete used for a structure . a pre - cast mould is filled with concrete and , upon curing , soaked in water for 28 days before delivering to a laboratory for the " crushing " test . the compressive force needed to break the concrete represents the strength of the concrete
在建筑過程中,建造商要按地盤中使用石屎數(shù)量的多寡,去定測(cè)試石屎強(qiáng)度的次數(shù),測(cè)試時(shí)建造商需要在預(yù)制的鑄模內(nèi)倒?jié)M石屎,待它凝固后浸在水里二十八日,再運(yùn)往實(shí)驗(yàn)室進(jìn)行測(cè)試,看看需要用幾大的力量才能把它壓碎,這個(gè)令石屎碎裂的力度就是石屎的強(qiáng)度。 - A two component design consisting of appropriate size and length of structural reinforcing rods and dead - end component is required to transfer axial tensile loads and distribute radial compressive forces through the plastic jacket and onto the internal strength members without damaging the fragile plastic jacket or internal optical fibers
螺旋預(yù)絞絲結(jié)構(gòu)不僅能有效地降低配合區(qū)域內(nèi)光纜單位應(yīng)力和避免應(yīng)力集中,傳遞軸向張力,而且將預(yù)絞絲的徑向壓力均勻地分布在這段較長(zhǎng)的配合區(qū)域內(nèi)。
更多例句: 下一頁(yè)